Inside the ZTE Pakistan Rack PDU Project

GUARD recently delivered customized 26-outlet rack PDUs for a ZTE data center project in Pakistan. The units combine a 20 × IEC C13 + 6 × IEC C19 outlet layout with centralized monitoring and remote PDU-level power switching.

The engineering work centered on three things: fitting the 26-outlet assembly into the rack installation constraints, adapting the monitoring software to the customer’s centralized management environment, and implementing Time-Sequenced Feedback Identification so operators can tell which outlet position a status message relates to.

The first solution was developed in approximately one month, and all manufacturing was completed within three months after the production phase began. The project team received recognition from ZTE for its execution.